Four decisions you cannot undo after the refit
Published on
I once spent three weeks choosing a paint colour for a room in my own flat, and about forty seconds deciding where the socket behind the television would go. The paint I have since changed twice. The socket is exactly where the electrician put it, and the television has been in the wrong place for six years because of it.
Hoteliers get called slow. I want to argue with that, because the people I meet are not slow. They are handed a refurbishment package written in a language they were never taught, asked to approve it in a meeting that runs long, and blamed afterwards for what was in it.
Somewhere in that package are four lines nobody reads out loud.

Europe is in the middle of a refurbishment wave. Lodging Econometrics counted 700 renovation and conversion projects across the region at the end of the fourth quarter of 2025, covering 90,066 rooms. Every one of those projects contains the same four lines. Most of them will be signed by somebody who was concentrating, quite reasonably, on the fabric.
The plaster is the deadline, and nobody circles it on a programme
Here is the thing, though. A building project has a moment that is more final than any of the dates on the contract.
BSRIA, the building services research body, describes the early phase of the work as everything done up to the point that plaster goes on the walls. Cables, pipework, the supports that will carry whatever hangs on the wall later: all of it goes in before that, because after it, none of it is reachable without opening the wall again.
Before the plaster, these are drawings. Somebody can move a line with a pencil and it costs a conversation.
After the plaster, they are the building.
That is the whole of the building trade you need for this. Everything below is a question you can ask without knowing another word of it.

Can anything sit behind the screen, or does it hang on the wall with a cable showing?
A screen does not fix to plasterboard. It fixes to something solid placed inside the wall to carry it, and the trade description is exactly that: a board fixed within the partition. Within. Meaning before the wall was closed.
The same decision settles whether anything can live behind the screen, or whether every device from now on sits on a shelf below it with a cable running down the wall.
A good answer sounds like: yes, there is backing across the whole area where the screen might go, and there is a recess behind it.
A bad answer sounds like: we will fix it to the studs, we know where the television is going.
The second answer is not wrong. It is just a decision, made once, on a drawing, by somebody who will not be in the room in 2033.
If another cable has to reach a room later, what does that involve?
I am not going to tell you how many cables a hotel room should have. Nobody can. There is no published figure, and anybody who gives you one is telling you about their own product.
The question is narrower and better: has anybody chosen, and do they know what adding one later involves?
It involves more than pulling a wire. The wiring regulations restrict where a concealed cable is allowed to run inside a wall, and tie those permitted routes to the position of the thing the cable feeds. So a new cable is not a free hand across a wall. It is a route somebody has to find, inside a finished room, in a building full of paying guests.
A good answer sounds like: here is what we have run, here is the spare, and here is the route if you need more.
A bad answer sounds like: we can always add one later.
Is there a socket where the screen goes?
The smallest of the four and the one that produces the most visible failure.
Power in the right place is decided at the same moment, on the same drawings, under the same regulations about where things may run inside a wall. Get it right and the room is clean. Get it wrong and there is a cable crossing the wall of a room that a designer spent a year on, for the next ten years, because the alternative is opening the wall.
A good answer sounds like: yes, behind the screen position, on the right circuit.
A bad answer sounds like: there is one by the desk.
Does the cupboard on each floor have room to grow?
This is the one nobody sees, and it is the one that quietly caps the other three.
Every cable in the building runs somewhere, and the route it runs in has a ceiling on how much it can hold. That size is chosen at design stage, and the trade knows exactly what happens next. NAPIT, writing in Professional Electrician in October 2021, put it plainly: it may be desirable to select the next size up, allowing for future additions, because there is no adjustment once it is installed.
Read that again, because it is the whole article in one sentence. Somebody chooses, early, on price. Nobody revisits it.
A good answer sounds like: here is the spare capacity we have left you, and here is the plan if you fill it.
A bad answer sounds like: it is sized for the design.

Most of it is not permanent, and the part that is has a price
Now the honest half, because a piece that tells you everything is permanent is a scare story and you would be right to stop reading.
Almost everything people agonise over at this stage can be changed on a service contract, on a Tuesday, without a builder. The screen. The box behind it. The interface, the apps, the channel line-up, the way a guest gets their own account onto the television. All of it is replaceable, and most of the anxiety in the room during a refurbishment is spent on exactly those things.
And the counter-argument to everything above is genuinely strong, so let me make it properly rather than weakly.
Nothing in a modern building is permanent. A contractor can run trunking around a skirting or at dado height in an afternoon. It needs no modification to the building structure at all, which is precisely why it is the standard answer in refurbishment work. Every one of those four things can be added later. The constraint is not the wall. It is the budget, and a budget is a decision an owner can make whenever they like.
That is true. All of it.
Here is what it misses.
The cost of the undo is not the trunking, and it is not the equipment. It is the room.

Cushman & Wakefield put German hotel performance for the full year 2025 at an average daily rate of about €117, with occupancy around 68%, which is a RevPAR of €78.80. Across Europe the same house put full-year RevPAR at €107.
Read that as the room rather than as an index. A German hotel room in 2025 earned about €117 on the nights it was sold, and it was sold about 68 nights in every hundred. That works out at about €79 for every night the room existed. A room that is not there to sell earns none of it.
I am not going to multiply that for you, and I am not going to tell you how many nights the work takes, because no honest source gives that number. Your contractor knows it. Ask them for it, multiply it by your own €79, and you have the real price of the undo in about ten seconds.
And then there is the part no budget line captures at all. The trunking ends up on the wall of the room you have just spent a year and a great deal of money making beautiful. A visible run of plastic at skirting height in a boutique room is the precise opposite of what the refurbishment was for. So the owner pays twice: once in room nights to hide it properly, or once in a room that looks like a compromise for a decade. Neither of those is a budget constraint.
A word on how often this comes round, because the numbers that circulate are worse than useless. HVS Europe looked at 76 management contracts covering 19,200 rooms and found soft furnishings replaced every six to eight years and the heavier items every twelve to thirteen. That describes branded and managed hotels, where a contract compels the spend. If you are independent, none of it applies to you. You refurbish when you decide to, which is the whole advantage of being independent and also the reason the decision matters more: nobody is going to force you back into that room in six years.
Which brings me back to the socket in my flat. I did not make a bad decision. I made a fast one, about something that looked small, in a moment when I was thinking about something else. That is the only failure mode here, and it is entirely avoidable.
You do not need to learn the building trade. You need four questions, at the next site meeting, before the fabric package is signed.
Can anything sit behind the screen? If another cable has to reach a room later, what does that involve? Is there a socket where the screen goes? Does the cupboard on each floor have room to grow?
They cost you four minutes. What would your contractor say to the fourth one?